---
title: "Prime cost: add food and labour before you celebrate sales | GoSufra"
description: "Why prime cost (food + labour) is the fastest read on a restaurant's health, how to calculate it, and what to do when it crosses 65%."
url: "https://gosufra.com/en/blog/prime-cost/"
language: "en"
source: "https://gosufra.com"
---
# Prime cost: add food and labour before you celebrate sales

Why prime cost (food + labour) is the fastest read on a restaurant's health, how to calculate it, and what to do when it crosses 65%.

2026-08-12 · 7 min read

![Illustration of food and labour costs stacked into one bar](https://gosufra.com/blog/prime-cost.svg)

## Key points

- Prime cost = food cost + labour cost. Rent and marketing come after; these two decide whether the month can work.
- A common target is under 60–65% of net sales. Above that, overhead has almost no room left.
- Do not chase food and labour as separate fights — a cheap roster that wastes food is not a win.
- You need both numbers from the same week. A food cost from last month plus this week's wages is noise.

Sales can rise and the owner can still go home with less. The usual reason is that **food and people moved together**, and nobody added them up.

That sum is **prime cost**. It is the one number that tells you whether the operating engine is healthy before rent, marketing and the electricity bill get a vote.

## The definition

```
  prime cost % = (food cost + labour cost) ÷ net sales × 100  
```

Use **consumed** food cost (opening + purchases − closing), not purchase invoices. Use **total people cost**, not the wage line alone.

A monthly example:

| Line | Amount | % of sales |
| --- | --- | --- |
| Net sales | 1,200,000 | 100% |
| Food consumed | 384,000 | 32% |
| Total people cost | 336,000 | 28% |
| **Prime cost** | **720,000** | **60%** |
| Occupancy + utilities + other | 240,000 | 20% |
| **Left for owner / tax / debt** | **240,000** | **20%** |

At 60% prime, the rest of the P&L still has air. At 70%, a normal rent starts to erase the month.

## Why this number beats watching food or labour alone

Managers trade the two without noticing.

- Cut two cooks → tickets slow → more comps and waste → food cost rises.

- Over-portion to “make service easier” → food cost rises → you hire another prep cook to keep up.

Each meeting looks like progress. Prime cost stays put, or climbs.

| Prime cost | Reading |
| --- | --- |
| Under 55% | Unusual, or a concept with very high prices |
| 55% – 63% | Healthy for most casual sites |
| 63% – 68% | Tight — one bad week of waste or overtime will hurt |
| Over 68% | The month cannot carry normal overhead |

A steakhouse at 66% can be fine. A coffee counter at 66% is in trouble. **The target moves with the concept; the discipline does not.**

## The three leaks that show up here first

1. **Variance you never investigate.** Theoretical food cost from recipes versus actual from the stocktake. A 3-point gap is already a prime-cost problem.
2. **Hours that do not match the curve.** Labour sitting through a dead afternoon is prime cost you can see on a sales-by-hour chart.
3. **Menu items that cannot carry their labour.** A dish at 22% food cost that takes twelve minutes of a senior cook is not cheap. Plate cost without time is incomplete.

## A four-week way to get it on one page

- **Week 1:** Produce both inputs properly — a stocktake for food, a full people-cost total for labour.

- **Week 2:** Split prime cost by weekday. Friday at 58% and Tuesday at 72% is a scheduling problem, not a “food” problem.

- **Week 3:** Pick the worse half. If food variance is over 2%, start there. If labour hours in the dead zone are the spike, start there. Do not do both at once.

- **Week 4:** Re-price or drop two dishes whose food-plus-prep time cannot clear a 60% prime contribution.

When recipes, stocktakes, clock-in and payroll sit in one system — as they do in GoSufra — prime cost is a weekly figure, not a reconstruction at month end. You see the sum while you can still change the roster or the portion, not after the rent has already left.

Watch prime cost the way you watch the door on a Saturday. If this number is wrong, every number after it is decoration.

- prime cost
- food cost
- labour cost
- profitability

## In the product

### [Recipes & Plate Costing](https://gosufra.com/en/features/recipe-costing/)

Explore

### [Payroll](https://gosufra.com/en/features/payroll-software/)

Explore

## Run all of this from one system

POS, kitchen, inventory, recipe costing, staff and accounting — connected, and free to start.

[Create your free account](https://app.gosufra.com/register?lang=en)

## Related articles

![Illustration of a percentage ring beside report lines](https://gosufra.com/blog/food-cost-percentage.svg)

Costing 2026-06-15 · 7 min read

### [Food cost percentage: the one number that reads your health](https://gosufra.com/en/blog/food-cost-percentage/)

How to calculate food cost percentage properly from stocktakes rather than invoices, what separates theoretical from actual, and what to do when the gap widens.

Read article

![Illustration of a clock beside a labour-cost percentage ring](https://gosufra.com/blog/labor-cost-percentage.svg)

People 2026-08-08 · 8 min read

### [Labour cost percentage: the number that eats profit after food](https://gosufra.com/en/blog/labor-cost-percentage/)

How to calculate restaurant labour cost the right way, what ranges are normal, and the schedule changes that move the number without cutting service.

Read article

![Illustration of bar charts with a trend line](https://gosufra.com/blog/restaurant-kpis.svg)

Analytics 2026-07-20 · 9 min read

### [Eleven numbers you should see every morning](https://gosufra.com/en/blog/restaurant-kpis/)

A practical restaurant dashboard: sales, average check, food cost, labour, prime cost, discounts and voids — with the formulas, the ranges, and what to do when they move.

Read article

[← All articles](https://gosufra.com/en/blog/)

[Contact us](https://t.me/GoSufraSupport)
