A thirty-day checklist for opening a restaurant
A week-by-week plan for getting a restaurant ready: menu and costing, suppliers, systems and hardware, training and a soft launch — in an order that does not conflict.
Most restaurants do not stumble at opening because of the food. They stumble because too much was left to the last week: the menu is not costed, the staff are not trained, and the system is configured the night before.
Here is a thirty-day plan in an order that does not conflict. Each item must be finished before the next.
Week 1: menu and costing
Every later decision — from fridge size to how many cooks — depends on the menu.
- Lock the final menu (start small; 25–35 items beats 60).
- Write a quantified recipe for every item, and every size.
- Cost each plate after yield.
- Set a target food cost percentage and price from it.
- Put packaging inside each item’s cost.
- Produce the final ingredient list with base units.
Do not move to week 2 until you know the price and cost of every item. Late pricing forces you to redo everything that follows.
Week 2: suppliers and stock
- At least three quotes per major ingredient.
- Agree a written specification (size, grade, packing), not just a name.
- Fix payment terms and delivery days.
- Calculate the opening order:
expected daily usage × days of cover + safety stock. - Set a reorder point per item.
- Prepare storage, shelving, FIFO and temperature checks.
- Load items into the inventory system with units and prices.
Week 3: systems and hardware
This is the week usually compressed into two days. It should not be.
Hardware:
- POS terminals and kitchen screens in their final positions.
- Thermal printers (till and kitchen), with Arabic printing tested.
- Branch network: router, access points, and coverage inside the kitchen specifically.
- Cash drawer, barcode scanner if needed, payment devices.
System:
- Load the menu, categories, prices, sizes and modifiers.
- Attach every item to its recipe and its kitchen station.
- Configure tax and service charge, and review the order with your accountant.
- Create users and assign roles and permissions.
- Set delivery zones, fees and minimums if you will deliver.
- Test offline mode: unplug the network and complete a full sale with a printed receipt.
- Print a test bill and read every line on it.
Week 4: training and soft launch
Training (4 days):
- One day on the menu: ingredients, allergens, how to describe a dish.
- One day on the system: every person completes ten full transactions themselves.
- One day on exceptions: void, refund, discount, modified order, internet outage.
- One day on service: greeting, handling a complaint, closing a shift.
Soft launch (2 days):
- One day with a limited guest list (friends and family) on the full menu.
- One day of deliberate pressure: fire 20 orders in 15 minutes and watch prep times.
Log every fault that appears. A soft launch is not a PR event — it is a stress test, and its purpose is to find breakages while you can still fix them.
Final day:
- Fix the top five problems the soft launch exposed.
- Run a full opening stocktake.
- Confirm every person knows their job for the first hour of trading.
After opening: the first thirty days
| Cadence | Review |
|---|---|
| Daily | Net sales, transactions, average check, discounts and voids |
| Daily | Prep times and the three slowest items |
| Weekly | High-value stock count |
| Weekly | Food cost and labour cost percentages |
| At 30 days | First menu engineering pass |
Recurring opening mistakes
- Too long a menu. Sixty items in a new kitchen means slow prep, dead stock and waste. Start small and add after two months based on real demand.
- Configuring the system on opening night. Anything left to the last night will be set up wrong.
- Theoretical training. Someone who never held the device has not been trained.
- Ignoring kitchen network coverage. Kitchens are hostile to wireless signal; test at the kitchen screen itself.
- An oversized opening order. Enthusiasm buys double what you need, and half of it expires in month one.
The point
A good opening is not a spectacular day. It is an ordinary day, repeatable. Every hour spent on this list before opening saves you a day of repair afterwards.
Run all of this from one system
POS, kitchen, inventory, recipe costing, staff and accounting — connected, and free to start.
Create your free account